{
  "release_sha256": "56c689d8dda8b9064b7969c6c6d69f0bc825d27c6db6507dacc302c1818f5559",
  "documented_examples": 104,
  "regression_verifiers": 72,
  "workflow_rows": 51,
  "missing_cited_files": [],
  "scope": "Citations and artifacts reconciled. Workflow acceptance is scoped to the evidence and open requirements in each row.",
  "workflows": [
    {
      "workflow": "Intelligent one-line",
      "implementation": "Optional grouped HTML drawing with equipment IDs, terminal sheet references and regeneration after wire import (`one-line-verification.json`)",
      "release_evidence": [
        "one-line-verification.json"
      ],
      "remaining_acceptance": "Verify engineering symbols, equipment-level layout and interactive editing."
    },
    {
      "workflow": "Nested networks",
      "implementation": "Nested terminal aliases for AC and IEC studies (`exchange-verification.json`) AC and IEC commands match flat results through twelve levels of multi-terminal aliases in a saved project.",
      "release_evidence": [
        "exchange-verification.json"
      ],
      "remaining_acceptance": "Verify import and flattening of actual commercial product hierarchies.",
      "deep_interface_verification": {
        "artifact": "ElectraGrid-nested-interface-benchmark.zip",
        "release_sha256": "10550472f1d661a962f52cc4fc5c8bc25e44aa1da8c2e36e687b8648128011ef"
      }
    },
    {
      "workflow": "Equipment libraries",
      "implementation": "Pinned equipment catalog revisions (`project-data-verification.json`) Content fingerprint pins retain the original record across revisions and detect replacement within the pinned revision. Project validation enforces the pin before IEC studies run. Catalog JSON export supplies the content fingerprints for adopting pins. A pin exported by an earlier release preserved the resolved record and IEC fault result after adding a newer revision in the current release. Saved catalog references require positive integer revisions during validation, catalog export and IEC studies.",
      "release_evidence": [
        "project-data-verification.json",
        "catalog-content-pin-verification.json"
      ],
      "remaining_acceptance": "Verify vendor curves, metadata provenance and retention with external vendor catalog updates.",
      "cross_release_verification": {
        "artifact": "ElectraGrid-catalog-cross-release-benchmark.zip",
        "release_sha256": "10550472f1d661a962f52cc4fc5c8bc25e44aa1da8c2e36e687b8648128011ef"
      }
    },
    {
      "workflow": "AC and DC control diagrams",
      "implementation": "AC/DC coil polarity, loaded voltage and time-based pickup (`control-wiring-verification.json`)",
      "release_evidence": [
        "control-wiring-verification.json"
      ],
      "remaining_acceptance": "Validate real relay characteristics, rectification and conductor-level device models."
    },
    {
      "workflow": "Panel schedules",
      "implementation": "Multipole schedule, slot validation and CSV export (`project-data-verification.json`) Saved slot-phase layout verifies multipole placement, spare positions, and demand by phase. Slot CSV reconciles circuit placements, spare slots, and per-phase load totals. Unequal circuit phase allocations reproduce connected and demand VA through the saved project and slot CSV. Explicit nonconsecutive pole slots support dual-column numbering, with phase, overlap and range validation and slot CSV export. Optional declared multipole position patterns reject phase-compatible locations outside the supplied layout.",
      "release_evidence": [
        "project-data-verification.json",
        "panel-slot-layout-verification.json",
        "panel-slot-csv-verification.json",
        "panel-phase-allocation-verification.json",
        "panel-explicit-slot-verification.json",
        "panel-multipole-restriction-verification.json"
      ],
      "remaining_acceptance": "Verify manufacturer-specific position restrictions, other hardware constraints, and a fresh ETAP panel report.",
      "manufacturer_layout_verification": {
        "artifact": "ElectraGrid-Siemens-P2-layout-benchmark.zip",
        "release_sha256": "a00c64584c865b019ca95b9314711624b465e1539937083e5f282355bf4836a4"
      },
      "manufacturer_pattern_subset_verification": {
        "artifact": "ElectraGrid-P2-placement-constraints.zip",
        "release_sha256": "99c2783e1d37fe675243f9d651982a569918359e9762a21f6d073b2b8bcadd3e"
      }
    },
    {
      "workflow": "Templates and reports",
      "implementation": "Project templates, HTML drawings and revisioned AC branch CSV (`ac-report-verification.json`)",
      "release_evidence": [
        "ac-report-verification.json"
      ],
      "remaining_acceptance": "Verify report rendering and saved template inheritance on a real study."
    },
    {
      "workflow": "GIS",
      "implementation": "WGS84 round trip and electrical endpoint checks (`gis-topology-verification.json`) Feeder length sums geographic path segments and matches the analytical bent-route benchmark. GeoJSON retains surveyed branch length and reports the signed difference from mapped geometry. Connected multipart branch geometry round-trips across the antimeridian while preserving electrical endpoint checks and route length. Optional export cutting at the longitude seam preserves route identity and surveyed length. High-latitude seam cuts follow the original great circle and preserve calculated spherical distance.",
      "release_evidence": [
        "gis-topology-verification.json",
        "gis-antimeridian-verification.json"
      ],
      "remaining_acceptance": "Verify coordinate transformations and third-party GIS round trips with utility feeder data. No independent GIS engine was available locally for this replay.",
      "reversed_high_latitude_verification": {
        "artifact": "ElectraGrid-GIS-high-latitude-benchmark.zip",
        "release_sha256": "6cc65ec9cedc1fed90a2b6f431d6460dd92120bfaf5bd43c4c81e24ec8e220b9"
      },
      "seam_variant_verification": {
        "artifact": "ElectraGrid-GIS-seam-variants.zip",
        "release_sha256": "f3226a9d1feba352228debd809cf1ec1d8e64bb97f548c5ba4db431a7f67147e"
      }
    },
    {
      "workflow": "Engineering exchange",
      "implementation": "Wire schedule import and QElectroTech QET/QETZ terminal exchange, including label writeback, native resave, and verified printable drawing packages.",
      "release_evidence": [
        "cnc40-pilot-verification.json",
        "wire-exchange-verification.json",
        "aegs02-import-verification.json",
        "export_autocad_terminal_edit.py",
        "evidence/ElectraGrid-CNC40-AEGS02-generated-import.zip",
        "qetz-native-import-verification.json",
        "qetz-exact-endpoint-verification.json",
        "qetz-imported-endpoints-verification.json",
        "qet-uuid-import-verification.json",
        "qetz-conductor-metadata-verification.json",
        "aegs03-fixture-verification.json"
      ],
      "remaining_acceptance": "Verify additional native CAD workflows and drawing variations, including AutoCAD Electrical project integration beyond verified terminal fixtures.",
      "external_verification": {
        "artifact": "ElectraGrid-CNC40-AEGS03-native-round-trip.zip",
        "sha256": "6776753db80d572107c36b577c1ef5bca56449d3f14c3e9e75433331b4da63a1",
        "release_sha256": "121c8e90d340533a8dfca7b2d9ad980dba595c78e4c52b296703b427ae842e0d",
        "report_rows": 40,
        "imported_rows": 21,
        "cross_drawing_rows": 3
      },
      "geometry_verification": {
        "artifact": "ElectraGrid-AEGS03-geometry-roundtrip.zip",
        "release_sha256": "5eec767f5e744e57c77ef4e8de00ebdd289720c5c82c7e67e01448de0ebe3bd0"
      },
      "linked_geometry_verification": {
        "artifact": "ElectraGrid-AEGS03-linked-geometry-roundtrip.zip",
        "release_sha256": "5eec767f5e744e57c77ef4e8de00ebdd289720c5c82c7e67e01448de0ebe3bd0"
      },
      "unnamed_endpoint_verification": {
        "artifact": "ElectraGrid-AEGS03-untagged-endpoints.zip",
        "release_sha256": "5eec767f5e744e57c77ef4e8de00ebdd289720c5c82c7e67e01448de0ebe3bd0"
      },
      "local_signal_verification": {
        "artifact": "ElectraGrid-AEGS03-signal-stubs.zip",
        "release_sha256": "5eec767f5e744e57c77ef4e8de00ebdd289720c5c82c7e67e01448de0ebe3bd0"
      },
      "open_end_verification": {
        "artifact": "ElectraGrid-AEGS03-open-end.zip",
        "release_sha256": "5eec767f5e744e57c77ef4e8de00ebdd289720c5c82c7e67e01448de0ebe3bd0"
      },
      "full_aegs03_verification": {
        "artifact": "ElectraGrid-AEGS03-full-roundtrip.zip",
        "release_sha256": "5eec767f5e744e57c77ef4e8de00ebdd289720c5c82c7e67e01448de0ebe3bd0",
        "sha256": "4c6888fef5feb9d152145b7e892461292e471911c07279075c28535e8ef3247c",
        "byte_identical_replayed_members": [
          "verification.json",
          "terminal.html",
          "reopened.html",
          "mapped.csv",
          "exported.csv",
          "imported.json"
        ]
      },
      "conductor_state_reimport": {
        "artifact": "ElectraGrid-CAD-conductor-state-evidence.zip",
        "sha256": "5f05d63131ed2219beef3e0eada4a7c8ec488f2c47919678398f59e43766bedc"
      }
    },
    {
      "workflow": "Balanced AC load flow",
      "implementation": "Fixed-tap AC from CDF or terminal-connected project (`ac-terminal-verification.json`)",
      "release_evidence": [
        "ac-terminal-verification.json",
        "ElectraGrid-data-center-example-verification.json"
      ],
      "remaining_acceptance": "Verify integrated loaded controls and compare a fresh ETAP run. The IEEE 14-bus operating point and branch flows have independent benchmarks.",
      "commercial_case_staging": {
        "artifact": "ElectraGrid-ETAP-IEEE14-staging-receipt.json",
        "release_sha256": "61b764980389a3224fb3930f1c7ecdacb84b7816c99f8280adae4f7f97a0ccc2"
      },
      "native_commercial_input_verification": {
        "artifact": "ElectraGrid-ETAP-IEEE14-native-input-receipt.json",
        "release_sha256": "61b764980389a3224fb3930f1c7ecdacb84b7816c99f8280adae4f7f97a0ccc2"
      },
      "commercial_comparison_package": {
        "artifact": "ElectraGrid-ETAP-balanced-AC-comparison.zip",
        "sha256": "09e258f502ff90e95ac07905a4aeea9099422f40bfc1c323c7e16d80aafa73d4"
      },
      "current_comparison_basis": {
        "artifact": "ElectraGrid-IEEE14-comparison-basis.json",
        "sha256": "ef4b4ac6bd306bea5aef379f7ea78a90b04590ee093e002a62a548f264b78e07"
      },
      "native_etap_input": {
        "artifact": "ElectraGrid-ETAP-IEEE14-native-input-receipt.json",
        "sha256": "77cc273bf1a69ce4d98c7e7e882ec9bfa2a452732a602efb71a4dbe3c31c053d"
      },
      "data_center_benchmark": {
        "artifact": "ElectraGrid-data-center-example-verification.json",
        "sha256": "b45b67395ba648b10cac96ab14aadf49f9e549bdb1844b21e8812e158ebd17a5"
      }
    },
    {
      "workflow": "Unbalanced AC load flow",
      "implementation": "Coupled phase and neutral impedance with mixed load models and sequence reporting (`coupled-four-wire-verification.json`)",
      "release_evidence": [
        "coupled-four-wire-verification.json"
      ],
      "remaining_acceptance": "Verify transformer connections, multi-feeder models and external solver benchmarks."
    },
    {
      "workflow": "DC load flow",
      "implementation": "Constant-power regulated operation and resistive loads with ideal current limiting (`dc-studies-verification.json`, `dc-fault-duty-verification.json`) Ideal constant-current feeder results reproduce analytical voltage and power and report infeasible demand. Parallel resistive, constant-current and constant-power loads reproduce the analytical operating point and power balance. Mixed DC pre-fault handoff preserves initial current, source-limit scope and load-flow fingerprint. The mixed-load report shows voltage-regulated constant-power capacity and signed margin. The source-limited capacity and margin match a separate current-balance calculation. The source limiter accepts the analytical boundary while rejecting demand immediately above it. The exported voltage-regulated ceiling reproduces the double root after saving and reopening the project.",
      "release_evidence": [
        "dc-fault-duty-verification.json",
        "dc-studies-verification.json",
        "dc-constant-current-verification.json",
        "dc-parallel-load-verification.json",
        "dc-parallel-fault-handoff-verification.json"
      ],
      "remaining_acceptance": "Verify converter-specific response, battery activation and an external benchmark for current-limited operation.",
      "equilibrium_benchmark": {
        "artifact": "ElectraGrid-DC-equilibrium-evidence.zip",
        "sha256": "d5f070ebc56ab6ba05a558e6db7c9830a8644738cf35a8c19adbe4ee4076253b"
      }
    },
    {
      "workflow": "Time-domain load flow",
      "implementation": "Quasi-static load, generation, switching, tap and grid-energy profiles (`voltage-exposure-verification.json`) Optional linear load ramps use midpoint samples and preserve saved switch transitions. Between-sample switching splits recalculate the load at each new midpoint and preserve profile energy. Optional cubic smoothstep ramps preserve the requested shape across interior switch events. An optional interval-boundary tap controller steps after sustained out-of-band observations and resets on recovery. Optional within-interval tap timing splits held load samples at delay expiration. CSV exports retain active tap ratio, service state, action and controller settings fingerprint. Multiple tap controllers share a solved event timeline and export per-controller actions. Nominally simultaneous tap deadlines within timestamp precision share one event boundary.",
      "release_evidence": [
        "voltage-exposure-verification.json",
        "ac-load-ramp-verification.json",
        "automatic-tap-timing-verification.json"
      ],
      "remaining_acceptance": "Validate measured load profiles, large-network controller interactions, and physical regulator models.",
      "ramp_convergence_verification": {
        "artifact": "ElectraGrid-AC-ramp-convergence.zip",
        "release_sha256": "70266344ee0c5de6bcf2402c90025cbd55b5bd2286c620bf8570e66c63ed6003"
      },
      "multi_bus_ramp_verification": {
        "artifact": "ElectraGrid-AC-five-bus-ramp.zip",
        "release_sha256": "70266344ee0c5de6bcf2402c90025cbd55b5bd2286c620bf8570e66c63ed6003"
      },
      "tap_outage_verification": {
        "artifact": "ElectraGrid-AC-tap-outage-benchmark.zip",
        "release_sha256": "0b33858e3b61fa06d9144d82f25bbbd355f9138c2c9e8b026b8a9ab1157b6e89"
      },
      "switching_tap_verification": {
        "artifact": "ElectraGrid-AC-switching-tap-benchmark.zip",
        "release_sha256": "85dbe4e46ad2fea9336f362715b5f395a4ed4eeb9db58790b05641cb5f2b314d"
      },
      "cascaded_tap_verification": {
        "artifact": "ElectraGrid-AC-cascaded-tap-benchmark.zip",
        "release_sha256": "5b80e1fa59ba48d4b9025190ae76ebef54385fa4864b28c5b80e883383f0b9fe"
      }
    },
    {
      "workflow": "AC fault location and types",
      "implementation": "Same-voltage multi-feeder radial sequence faults and parallel-source outage cases (`cable-impedance-verification.json`)",
      "release_evidence": [
        "cable-impedance-verification.json"
      ],
      "remaining_acceptance": "Verify grounded transformer and meshed sequence paths against independent studies."
    },
    {
      "workflow": "AC fault method",
      "implementation": "Maximum initial RMS IEC cases, including parallel sources (`iec-parallel-verification.json`)",
      "release_evidence": [
        "iec-parallel-verification.json"
      ],
      "remaining_acceptance": "Benchmark minimum IEC and ANSI methods separately."
    },
    {
      "workflow": "DC short circuit",
      "implementation": "Series RL current, modeled definite-time clearing, interrupting and withstand screens, and passive discharge with input fingerprints (`dc-fault-duty-verification.json`) Mixed DC pre-fault handoff preserves initial current, source-limit scope and load-flow fingerprint.",
      "release_evidence": [
        "dc-fault-duty-verification.json",
        "dc-parallel-fault-handoff-verification.json",
        "dc-csv-provenance-verification.json"
      ],
      "remaining_acceptance": "Benchmark battery and converter sources, actual breaker interruption, recovery voltage, and device ratings.",
      "early_clearing_benchmark": {
        "artifact": "ElectraGrid-DC-early-clearing-evidence.zip",
        "sha256": "098a68629b09dfb6de09565f6b18195295a54a6364594998aafe2ef48f6d997b"
      },
      "prefault_handoff_benchmark": {
        "artifact": "ElectraGrid-DC-handoff-evidence.zip",
        "sha256": "df7733a8333931a199e561d994d515b9cdac792d7de733401eaa2538387100c5"
      }
    },
    {
      "workflow": "Source contributions and equipment duty",
      "implementation": "IEC source contributions and equipment ratings, with fixed and clearing-band RMS profiles, integrated thermal duty, withstand crossing, device comparisons and CSV export.",
      "release_evidence": [
        "cable-impedance-verification.json",
        "iec-duty-verification.json",
        "protection-provenance-verification.json",
        "double-ground-duty-verification.json",
        "ground-return-batch-verification.json",
        "crossing-export-verification.json",
        "band-position-verification.json",
        "ElectraGrid-current-ac-dc-duty-verification.json",
        "ElectraGrid-current-dc-handoff-export-verification.json",
        "ElectraGrid-dc-changed-input-verification.json",
        "ElectraGrid-combined-panel-protection-verification.json",
        "ElectraGrid-combined-panel-duty-change-verification.json"
      ],
      "remaining_acceptance": "Validate interruption duty and dynamic device clearing against external reference cases.",
      "external_verification": {
        "artifact": "ElectraGrid-protection-release-replay.json",
        "release_sha256": "121c8e90d340533a8dfca7b2d9ad980dba595c78e4c52b296703b427ae842e0d"
      },
      "multisegment-duty": {
        "artifact": "ElectraGrid-multisegment-duty-evidence.zip",
        "sha256": "bc50c896512682438d61882b4715748ab772b7605456fc6ebea249f720b87ade"
      },
      "ac_dc_duty_replay": {
        "artifact": "ElectraGrid-current-ac-dc-duty-verification.json",
        "sha256": "ca1607043392112ef73453edd38ffbc58d5a698eb9a0d33a2e1062da5d1ad881"
      },
      "dc_export_replay": {
        "artifact": "ElectraGrid-current-dc-handoff-export-verification.json",
        "sha256": "765b27a6d2909e3d270fbc4903e9f2fdebcc130ddeaa117606aa57a9744ef76b"
      },
      "dc_input_benchmark": {
        "artifact": "ElectraGrid-dc-changed-input-verification.json",
        "sha256": "17dd644eec5bf002c1d23eec100eb68937c816e818bedd3914ea4259929f3252"
      },
      "combined_panel_protection": {
        "artifact": "ElectraGrid-combined-panel-protection-verification.json",
        "sha256": "a36044c5da098717f2f2d2f35ade06f265907e35ae507a80c03554aa9e61303e"
      },
      "combined_panel_rating_change": {
        "artifact": "ElectraGrid-combined-panel-duty-change-verification.json",
        "sha256": "6b2a536fab39f5c191e16eee392898a80c75f507ed23d839f7c16a3064a17cac"
      }
    },
    {
      "workflow": "Fault reporting and arc-flash handoff",
      "implementation": "Named IEC outage handoff carries the full matching thermal duty result and fingerprints for clearing and incident-energy review. A stale initial current rejects the handoff.",
      "release_evidence": [
        "cable-impedance-verification.json",
        "protection-provenance-verification.json",
        "mixed-duty-arc-handoff-verification.json",
        "ElectraGrid-current-arc-handoff-evidence.json",
        "band-position-verification.json",
        "ElectraGrid-current-ac-dc-duty-verification.json",
        "ElectraGrid-combined-panel-protection-verification.json",
        "ElectraGrid-combined-panel-duty-change-verification.json",
        "ElectraGrid-combined-panel-stale-review-verification.json"
      ],
      "remaining_acceptance": "Verify commercial exchange and site-specific incident-energy results through independent engineering review.",
      "external_verification": {
        "artifact": "ElectraGrid-protection-release-replay.json",
        "release_sha256": "121c8e90d340533a8dfca7b2d9ad980dba595c78e4c52b296703b427ae842e0d"
      },
      "final_handoff_replay": {
        "artifact": "ElectraGrid-arc-handoff-release-replay.zip",
        "release_sha256": "5eec767f5e744e57c77ef4e8de00ebdd289720c5c82c7e67e01448de0ebe3bd0"
      },
      "multisegment-duty": {
        "artifact": "ElectraGrid-multisegment-duty-evidence.zip",
        "sha256": "bc50c896512682438d61882b4715748ab772b7605456fc6ebea249f720b87ade"
      },
      "ac_dc_duty_replay": {
        "artifact": "ElectraGrid-current-ac-dc-duty-verification.json",
        "sha256": "ca1607043392112ef73453edd38ffbc58d5a698eb9a0d33a2e1062da5d1ad881"
      },
      "combined_panel_protection": {
        "artifact": "ElectraGrid-combined-panel-protection-verification.json",
        "sha256": "a36044c5da098717f2f2d2f35ade06f265907e35ae507a80c03554aa9e61303e"
      },
      "combined_panel_rating_change": {
        "artifact": "ElectraGrid-combined-panel-duty-change-verification.json",
        "sha256": "6b2a536fab39f5c191e16eee392898a80c75f507ed23d839f7c16a3064a17cac"
      },
      "stale_review_recovery_benchmark": {
        "artifact": "ElectraGrid-combined-panel-stale-review-verification.json",
        "sha256": "74ba2fa37be3b86b5d808485817f31672091d6a76eb97963e62d36d82a59213e"
      }
    },
    {
      "workflow": "Motor starting",
      "implementation": "Torque-speed and load curves, starter stages, fixed feeder sag and protective clearing with traceable curve inputs (`motor-start-curve-verification.json`)",
      "release_evidence": [
        "motor-start-curve-verification.json",
        "ElectraGrid-panel-motor-start-verification.json",
        "ElectraGrid-panel-motor-speed-verification.json",
        "ElectraGrid-panel-motor-speed-export-verification.json",
        "ElectraGrid-panel-motor-i2t-limit-verification.json",
        "ElectraGrid-panel-motor-deadline-verification.json",
        "ElectraGrid-panel-motor-voltage-limits-verification.json"
      ],
      "remaining_acceptance": "Validate speed-dependent electrical feedback, manufacturer curves and field clearing.",
      "fixed_voltage_panel_benchmark": {
        "artifact": "ElectraGrid-panel-motor-start-verification.json",
        "sha256": "5b056e4676d2809bc71811d935eb37129655625d841ce9a06445f3102587aaeb"
      },
      "speed_dependent_panel_benchmark": {
        "artifact": "ElectraGrid-panel-motor-speed-verification.json",
        "sha256": "9d6809667aab8053cd3777f64dcd73e9d8a1b11e4159ed0cb7b42e9ddcf839c3"
      },
      "speed_profile_csv_benchmark": {
        "artifact": "ElectraGrid-panel-motor-speed-export-verification.json",
        "sha256": "b7bf7ea746ca06e6a3ef01fdeeb3f4c48a49fed2bf453c54c19008a62ec73543"
      },
      "panel_motor_i2t_limit": {
        "artifact": "ElectraGrid-panel-motor-i2t-limit-verification.json",
        "sha256": "6788f050ecc0d3749825a789c2dae157cdf8d4b6a4071d19e4bbeff300a1d13f"
      },
      "deadline_benchmark": {
        "artifact": "ElectraGrid-panel-motor-deadline-verification.json",
        "sha256": "a8e18c60a432fdd24f57ad748dceef060c3859441f2690312bcaf7c9fea68133"
      },
      "voltage_limits_benchmark": {
        "artifact": "ElectraGrid-panel-motor-voltage-limits-verification.json",
        "sha256": "f9255b27fb77b5172c34859e25f7ac4a1954d5b5c139f960e609945dc37c5b4c"
      }
    },
    {
      "workflow": "Harmonics and frequency scans",
      "implementation": "Distributed injections, tuned filters, explicit or uniform sweeps and peak refinement with one- and two-bus analytical checks (`harmonic-network-verification.json`)",
      "release_evidence": [
        "harmonic-network-verification.json"
      ],
      "remaining_acceptance": "The five-bus mesh has an independent solver and between-sample peak benchmark. Verify manufacturer data and broader resonance coverage."
    },
    {
      "workflow": "Battery sizing and discharge",
      "implementation": "Candidate capacity and duty screening (`dynamics-verification.json`) Mixed current and resistance steps use the supplied voltage curve, and an exponential closed-form case verifies voltage, current, charge and cutoff time. Released CLI results match an independent two-slope resistance discharge calculation, including voltage cutoff and capacity exhaustion. Constant-power steps integrate on the high-voltage operating branch and report voltage cutoff, power limit or depletion.",
      "release_evidence": [
        "dynamics-verification.json"
      ],
      "remaining_acceptance": "Validate vendor curves, temperature and aging factors against measured or manufacturer data.",
      "resistive_knee_verification": {
        "artifact": "ElectraGrid-battery-resistive-knee-benchmark.zip",
        "release_sha256": "42a9654836179d7dabf5304762fdb064b708a583a9ef147a7bf33d3390ded5ce"
      },
      "constant_power_timing_verification": {
        "artifact": "ElectraGrid-battery-power-timing-benchmark.zip",
        "release_sha256": "c46c1a031ceb870988537822124085302b522865280bf8e6b1eab39a3755df71"
      },
      "mixed_load_verification": {
        "artifact": "ElectraGrid-battery-mixed-mode-benchmark.zip",
        "release_sha256": "c46c1a031ceb870988537822124085302b522865280bf8e6b1eab39a3755df71"
      }
    },
    {
      "workflow": "Time-current curves",
      "implementation": "Log-log interpolation of supplied curve points (`protection-workflow-verification.json`)",
      "release_evidence": [
        "protection-workflow-verification.json"
      ],
      "remaining_acceptance": "Verify measured or manufacturer-provided trip data and bands."
    },
    {
      "workflow": "Selectivity and sequence of operation",
      "implementation": "Pointwise upstream/downstream coordination margin (`protection-workflow-verification.json`)",
      "release_evidence": [
        "protection-workflow-verification.json"
      ],
      "remaining_acceptance": "Verify matched real-device bands and multi-device sequence."
    },
    {
      "workflow": "Distance protection",
      "implementation": "Ideal forward mho zone classification (`distance-verification.json`)",
      "release_evidence": [
        "distance-verification.json"
      ],
      "remaining_acceptance": "Verify device-specific characteristics, directionality, and fault resistance in an independent relay case."
    },
    {
      "workflow": "AC and DC arc flash",
      "implementation": "AC clearing-time and supplied incident-energy review (`protection-provenance-verification.json`)",
      "release_evidence": [
        "protection-provenance-verification.json"
      ],
      "remaining_acceptance": "Implement and independently benchmark AC and DC energy calculations."
    },
    {
      "workflow": "Worst-case arc flash",
      "implementation": "Compares supplied incident-energy results across named IEC source configurations at a common bus and study basis, with complete report coverage required for a maximum (`cable-impedance-verification.json`).",
      "release_evidence": [
        "cable-impedance-verification.json"
      ],
      "remaining_acceptance": "Verify with independently calculated incident energies and field switching configurations."
    },
    {
      "workflow": "Labels work permits and shock checks",
      "implementation": "Draft arc-flash engineering review sheet verifies a common study basis, pending evidence and linked reports (`cable-impedance-verification.json`).",
      "release_evidence": [
        "cable-impedance-verification.json"
      ],
      "remaining_acceptance": "Implement and verify field labels, work permits, jurisdiction-specific fields and independent shock assessment."
    },
    {
      "workflow": "Ground-grid analysis",
      "implementation": "Homogeneous-soil rod resistance estimate (`ground-thermal-verification.json`)",
      "release_evidence": [
        "ground-thermal-verification.json"
      ],
      "remaining_acceptance": "Benchmark grid resistance and touch and step potential for a documented grid."
    },
    {
      "workflow": "Cable and line impedance",
      "implementation": "Temperature-corrected cable sequence data in AC and IEC studies (`cable-impedance-verification.json`)",
      "release_evidence": [
        "cable-impedance-verification.json"
      ],
      "remaining_acceptance": "Derive and benchmark impedance from geometry, mutual coupling and return paths."
    },
    {
      "workflow": "Ampacity and cable sizing",
      "implementation": "Checks corrected ampacity, voltage drop, device rating, fault energy and optional buried-route temperature, with traceable candidate margins in CSV (`cable-size-verification.json`).",
      "release_evidence": [
        "cable-size-verification.json",
        "ElectraGrid-300-ft-feeder-drop-verification.json",
        "ElectraGrid-300-ft-cable-sizing-verification.json",
        "ElectraGrid-300-ft-cable-export-verification.json"
      ],
      "remaining_acceptance": "Validate manufacturer inputs, route conditions and selections against field and commercial results.",
      "300_ft_feeder_drop": {
        "artifact": "ElectraGrid-300-ft-feeder-drop-verification.json",
        "sha256": "6b7b3a04ff4be20b502e3475499bb81eae29d9e8dd1ab169946aa8e8580d722f"
      },
      "300_ft_cable_sizing": {
        "artifact": "ElectraGrid-300-ft-cable-sizing-verification.json",
        "sha256": "1cf3d713d81223da5e68d813ac44e0ca00ef91149ccddee7a6f68593d9ef750d"
      },
      "300_ft_cable_export": {
        "artifact": "ElectraGrid-300-ft-cable-export-verification.json",
        "sha256": "519a18bc8973e095e4057eee5de54fc50a1fe4af0945116342cc065137004c9c"
      }
    },
    {
      "workflow": "Underground thermal analysis",
      "implementation": "Equal and unequal cable currents, mixed cable properties, individual temperature limits, pairwise heating and homogeneous direct-burial geometry (`ground-thermal-verification.json`, `unequal-buried-thermal-verification.json`).",
      "release_evidence": [
        "ground-thermal-verification.json",
        "unequal-buried-thermal-verification.json"
      ],
      "remaining_acceptance": "Benchmark against documented direct-burial installations and add validated layered-soil and duct-bank models."
    },
    {
      "workflow": "Raceway layout",
      "implementation": "Shared route length, elevation totals and circular occupancy with a route fingerprint (`raceway-verification.json`).",
      "release_evidence": [
        "raceway-verification.json"
      ],
      "remaining_acceptance": "Verify layout drawings, field dimensions and applicable occupancy rules."
    },
    {
      "workflow": "Cable pulling",
      "implementation": "Two-direction single-cable calculation for straight, horizontal and vertical sections, with endpoint tension and exit-based sidewall limit screens and feed windows.",
      "release_evidence": [
        "raceway-verification.json",
        "directional-pull-verification.json",
        "directional-pull-csv-verification.json",
        "directional-pull-limits-verification.json",
        "pull-feed-window-verification.json",
        "pull-feed-window-csv-verification.json"
      ],
      "remaining_acceptance": "Verify contact and peak pressure along vertical bends, multi-cable pulling and manufacturer or field cases.",
      "multi_bend_verification": {
        "artifact": "ElectraGrid-pull-window-multi-bend.zip",
        "release_sha256": "e291e878ef46113f0f71f7cbdb43d4417400c4a07d2f95faffbead5059adb956"
      },
      "analytical_benchmark": {
        "artifact": "ElectraGrid-cable-pull-benchmark.zip",
        "sha256": "99150bbbdde4a374333f32d281b264e67b6d47c0b3fd75e646d624e68dd672b3"
      }
    },
    {
      "workflow": "Transformer sizing and taps",
      "implementation": "Profile-based nameplate and thermal screening with static and scheduled taps (`transformer-size-verification.json`)",
      "release_evidence": [
        "transformer-size-verification.json"
      ],
      "remaining_acceptance": "Verify automatic regulation, separate oil and winding states, and manufacturer criteria."
    },
    {
      "workflow": "Transient stability",
      "implementation": "Single-machine first-swing screening (`dynamics-verification.json`)",
      "release_evidence": [
        "dynamics-verification.json"
      ],
      "remaining_acceptance": "Three single-machine critical clearing thresholds match a SciPy trajectory reference. Verify multimachine dynamics and controls."
    },
    {
      "workflow": "Electromagnetic transients and inrush",
      "implementation": "Transformer energization screens ideal first-cycle flux, residual flux and closing angle against a supplied knee (`generator-startup-verification.json`). Selectable first-cycle harmonic orders include a fifth-order analytical benchmark. Saved-project harmonic CSV preserves the study fingerprint and spectrum. Separate magnetization slopes reproduce peak, mean, RMS and second harmonic against an analytical benchmark. Closing-angle comparison identifies independent governing flux, duration, and current cases.",
      "release_evidence": [
        "generator-startup-verification.json",
        "energization-harmonic-verification.json",
        "energization-harmonic-csv-verification.json",
        "energization-asymmetric-verification.json",
        "energization-closing-angle-verification.json"
      ],
      "remaining_acceptance": "Model magnetizing current, saturation and circuit interactions and benchmark against an EMT reference.",
      "asymmetric_inrush_benchmark": {
        "artifact": "ElectraGrid-transformer-inrush-benchmark.zip",
        "sha256": "4a21cb47e22fd3bae2538c983e59b0e091cb1e6dbf85add8843864ab4022e458"
      }
    },
    {
      "workflow": "Generator startup",
      "implementation": "First-order speed and voltage milestones plus an offline frequency and phase observation screen (`generator-startup-verification.json`).",
      "release_evidence": [
        "generator-startup-verification.json"
      ],
      "remaining_acceptance": "Verify prime mover and excitation models, dynamic synchronization and load pickup with independent and field data."
    },
    {
      "workflow": "User-defined dynamic models",
      "implementation": "Scalar first-order model with interval-held commands (`dynamic-block-verification.json`) Optional linear command ramps are supported per interval. Sample CSV includes a fingerprint of the dynamic model inputs. The scalar block can initialize at the first command's equilibrium.",
      "release_evidence": [
        "dynamic-block-verification.json",
        "ramped-command-verification.json",
        "opposing-ramp-verification.json",
        "dynamic-csv-verification.json",
        "equilibrium-verification.json"
      ],
      "remaining_acceptance": "Validate initialization on imported models, check physical units, and verify coupled network integration against independent model results.",
      "analytical_benchmark": {
        "artifact": "ElectraGrid-dynamic-model-benchmark.zip",
        "sha256": "64d9c6c83377ce9d4e6d0401d9e5a0cbaece16734f303fab4571df3fcaf09bf3"
      }
    },
    {
      "workflow": "Contingencies",
      "implementation": "Fixed-tap AC branch outages, targeted equipment and branch selection, ranked findings, and scenario-status CSV. Includes independent IEEE 14-bus PYPOWER coverage (`rated-outage-verification.json`, `wire-exchange-verification.json`). Individual bus limits govern the baseline and ranked outage voltage violations, verified on IEEE 14. Ranked findings CSV preserves applicable limits, deviations and study fingerprint. Optional island summaries expose scheduled net injection and reference-bus availability. Optional island AC study reproduces an analytical voltage and loss benchmark and identifies components without a reference. Island overloads retain saved-project equipment tags. The scenario-summary CSV reproduces island AC and scheduled-injection details from JSON.",
      "release_evidence": [
        "rated-outage-verification.json",
        "wire-exchange-verification.json",
        "contingency-local-voltage-verification.json",
        "contingency-local-voltage-csv-verification.json",
        "contingency-island-injection-verification.json",
        "contingency-island-ac-verification.json",
        "contingency-island-analytical-verification.json",
        "contingency-island-equipment-verification.json",
        "contingency-island-csv-verification.json",
        "ElectraGrid-data-center-example-verification.json"
      ],
      "remaining_acceptance": "Extend the benchmark to other networks and compare with a fresh ETAP run. The IEEE 14-bus regression covers three independently screened branch ratings.",
      "data_center_benchmark": {
        "artifact": "ElectraGrid-data-center-example-verification.json",
        "sha256": "b45b67395ba648b10cac96ab14aadf49f9e549bdb1844b21e8812e158ebd17a5"
      }
    },
    {
      "workflow": "Reliability",
      "implementation": "Connectivity-based customer interruptions and indices (`topology-restoration-verification.json`) The offline restoration window includes carry-in hours and energy while counting only new interruptions. Interruption-window CSV reconciles carry-in and new interruption counts and exposure to the JSON report. The interruption-window CSV carries unserved energy and exclusions and reconciles adjusted totals. CSV per-window costs reconcile with the raw outage cost estimate.",
      "release_evidence": [
        "topology-restoration-verification.json",
        "restoration-carry-in-verification.json",
        "restoration-window-csv-verification.json"
      ],
      "remaining_acceptance": "Explicit exclusions are verified for offline and topology-based accounting. Verify actual utility policy and live inputs."
    },
    {
      "workflow": "Capacitor placement",
      "implementation": "Single- and multi-location placement, fixed and voltage-dependent shunts, and snapshot loss-cost ranking (`planning-verification.json`, `capacitor-placement-verification.json`) A two-bus analytical benchmark independently verifies staged scenario losses, voltages and annual economics. Ordered load scenarios can minimize loss cost under a physical stage-transition limit. Schedules report the number of stage changes for each installed bank. The optimizer enforces optional per-bank switching limits in addition to the schedule-wide limit. Optional per-bank switching costs enter optimization and are itemized in annual costs. Optional per-bank minimum dwell hours constrain successive stage changes within the modeled sequence. Optional initial bank fraction and elapsed dwell constrain startup switching, including its count and cost.",
      "release_evidence": [
        "capacitor-placement-verification.json",
        "planning-verification.json"
      ],
      "remaining_acceptance": "Validate automated periodic wraparound and utility-scale feeders.",
      "external_verification": {
        "artifact": "ElectraGrid-capacitor-economics-benchmark.zip",
        "release_sha256": "3c3c3462e9e19966080b6a8df75ab27dae541a8f62bdbfbdde1d5db1e5e0bf7c"
      },
      "switching_verification": {
        "artifact": "ElectraGrid-capacitor-switching-evidence.zip",
        "release_sha256": "c1e1c29520979f1102b6c2f43f05d144c9006eaeaf118f6e10edb7a92a6b092e"
      },
      "bank_verification": {
        "artifact": "ElectraGrid-capacitor-bank-evidence.zip",
        "release_sha256": "cb4d918a2c0b85b3d9ba0b675c3216859005001c173324e26131f1ff69873b98"
      },
      "bank_limit_verification": {
        "artifact": "ElectraGrid-capacitor-bank-limit-evidence.zip",
        "release_sha256": "4685e7a98b0fb5d13f05c598c2fa913eeaa0e5e352351ddabacda999d4fca959"
      },
      "wear_verification": {
        "artifact": "ElectraGrid-capacitor-wear-evidence.zip",
        "release_sha256": "9b7371ebc9f5ee4b855d90382f0e4da8fe4e4f4497743697e3ed06b3e87b83b2"
      },
      "dwell_verification": {
        "artifact": "ElectraGrid-capacitor-dwell-evidence.zip",
        "release_sha256": "caf9cf8bfc43d2a226aeff6724180727d3d080b76c6dd9da818e8ba28ff394b5"
      },
      "fractional_dwell_verification": {
        "artifact": "ElectraGrid-capacitor-fractional-dwell-evidence.zip",
        "release_sha256": "71239086baf1b01914530162eba52f9fb31d9fef2c8a29e0afde567c74c70bfa"
      },
      "initial_state_verification": {
        "artifact": "ElectraGrid-capacitor-initial-state-evidence.zip",
        "release_sha256": "90f66661deabf06d774cbdcd4a6a9e6d4f242d0c7cc2e51e04d5899b4a4e1404"
      },
      "repeated_schedule_verification": {
        "artifact": "ElectraGrid-capacitor-repeated-schedule.zip",
        "release_sha256": "90f66661deabf06d774cbdcd4a6a9e6d4f242d0c7cc2e51e04d5899b4a4e1404"
      },
      "five_bus_verification": {
        "artifact": "ElectraGrid-capacitor-five-bus-benchmark.zip",
        "release_sha256": "90f66661deabf06d774cbdcd4a6a9e6d4f242d0c7cc2e51e04d5899b4a4e1404"
      }
    },
    {
      "workflow": "Feeder hosting capacity",
      "implementation": "Snapshot generation feasibility bracket (`planning-verification.json`)",
      "release_evidence": [
        "planning-verification.json",
        "ElectraGrid-distributed-hosting-rating-verification.json",
        "ElectraGrid-distributed-hosting-thermal-verification.json",
        "ElectraGrid-distributed-hosting-export-verification.json"
      ],
      "remaining_acceptance": "Two DER sites, two output profiles, site ratings and a scenario-specific branch ampacity passed on a synthetic 33-bus feeder. Verify protection constraints, additional feeder configurations and representative utility data.",
      "distributed_rating_benchmark": {
        "artifact": "ElectraGrid-distributed-hosting-rating-verification.json",
        "sha256": "2d6b1e35ed3a0bc7ce4192ca60b817d4e00a09786d4310ae43ea9394b110cf86",
        "release_sha256": "56c689d8dda8b9064b7969c6c6d69f0bc825d27c6db6507dacc302c1818f5559"
      },
      "distributed_thermal_benchmark": {
        "artifact": "ElectraGrid-distributed-hosting-thermal-verification.json",
        "sha256": "6388ee7eb112f0225c8a1ef206616fa94175e8d986cfe5fa610b26701870dea6",
        "release_sha256": "56c689d8dda8b9064b7969c6c6d69f0bc825d27c6db6507dacc302c1818f5559"
      },
      "distributed_export_benchmark": {
        "artifact": "ElectraGrid-distributed-hosting-export-verification.json",
        "sha256": "c80fcb986199803281fbd9a1c5a786ba432ac6b8a72dd5182b21d6f789b99fd7",
        "release_sha256": "56c689d8dda8b9064b7969c6c6d69f0bc825d27c6db6507dacc302c1818f5559"
      }
    },
    {
      "workflow": "SCADA and monitoring",
      "implementation": "Offline multi-point replay with quality, receipt times, freshness and historical CSV (`operations-verification.json`, `telemetry-history-verification.json`) Receipt-delay screening preserves the previous accepted state until timely feedback arrives. Historian CSV ingestion reproduces delay screening and source-linked checkpoint exports. Decimal-second thresholds classify equal and strictly over-limit receipt delays and freshness accurately. Historical age and freshness use the same decimal-second interval. Offline historian replay distinguishes uncertain quality and retains the previous good observation.",
      "release_evidence": [
        "operations-verification.json",
        "telemetry-history-verification.json",
        "telemetry-delay-verification.json",
        "telemetry-delay-csv-verification.json",
        "telemetry-fractional-boundary-verification.json",
        "telemetry-uncertain-quality-verification.json",
        "historian-malformed-csv-verification.json",
        "mapped-restoration-verification.json",
        "ElectraGrid-restoration-dwell-boundary-verification.json"
      ],
      "remaining_acceptance": "Verify protocol and historian behavior with representative captures and a live connection.",
      "switching_feedback_benchmark": {
        "artifact": "ElectraGrid-switching-replay-evidence.zip",
        "sha256": "398df469b5bd8896712069a167038e99ebac6135d9566541c5a82650b0afa25c"
      },
      "shared_switching_benchmark": {
        "artifact": "ElectraGrid-shared-switching-evidence.zip",
        "sha256": "c34f2927eeefa6c2b9b0a6b63014f6db8dd89396e3ba0c59db30a01e21ba53fc"
      },
      "reclose_boundary_benchmark": {
        "artifact": "ElectraGrid-restoration-dwell-boundary-verification.json",
        "sha256": "7b17636206df23e4e275a5bbfe6cf88a7657f151475c8e33875c14a18b64280c"
      }
    },
    {
      "workflow": "Energy and distribution management",
      "implementation": "Priority dispatch profiles, storage, reserve and AC-screened load plans (`dispatch-priority-verification.json`)",
      "release_evidence": [
        "dispatch-priority-verification.json"
      ],
      "remaining_acceptance": "Verify constrained redispatch, operational telemetry and live integration."
    },
    {
      "workflow": "Outage management",
      "implementation": "Offline topology restoration from explicit branch states or mapped switching replay, with optional balanced AC screening, customer interruption accounting, load-profile energy and estimated outage cost, and snapshot and accounting CSV exports.",
      "release_evidence": [
        "topology-restoration-verification.json",
        "mapped-restoration-verification.json",
        "ElectraGrid-restoration-same-time-dwell-verification.json",
        "ElectraGrid-restoration-dwell-boundary-verification.json"
      ],
      "remaining_acceptance": "Validate switching policies and simulated restoration constraints against representative field scenarios, then verify live restoration integration.",
      "same_timestamp_switching_benchmark": {
        "artifact": "ElectraGrid-restoration-same-time-dwell-verification.json",
        "sha256": "3f3177564a575013be1180c4db46d979f152fa0529ac4cd96c9698344cc75f1e"
      },
      "reclose_boundary_benchmark": {
        "artifact": "ElectraGrid-restoration-dwell-boundary-verification.json",
        "sha256": "7b17636206df23e4e275a5bbfe6cf88a7657f151475c8e33875c14a18b64280c"
      }
    },
    {
      "workflow": "Switching and load shedding",
      "implementation": "Topology-aware outage replay, load shedding, timed interlocks, feedback coverage and switching audit CSV with input fingerprints (`topology-restoration-verification.json`, `switching-replay-verification.json`). Saved switching plans can drive restoration timelines through a switch-to-branch map, with matching switching fingerprints in JSON and CSV.",
      "release_evidence": [
        "switching-replay-verification.json",
        "topology-restoration-verification.json",
        "mapped-restoration-verification.json",
        "ElectraGrid-restoration-dwell-boundary-verification.json"
      ],
      "remaining_acceptance": "Verify combined topology and timing against independently captured switching records. Field integration and operating procedures require direct acceptance evidence.",
      "reclose_boundary_benchmark": {
        "artifact": "ElectraGrid-restoration-dwell-boundary-verification.json",
        "sha256": "7b17636206df23e4e275a5bbfe6cf88a7657f151475c8e33875c14a18b64280c"
      }
    },
    {
      "workflow": "Microgrids",
      "implementation": "Connectivity-based island dispatch, grid-forming eligibility and AC screening (`dispatch-priority-verification.json`)",
      "release_evidence": [
        "dispatch-priority-verification.json"
      ],
      "remaining_acceptance": "Verify dynamic transition, synchronization and field acceptance."
    },
    {
      "workflow": "Rail traction",
      "implementation": "Ideal traction and regenerative energy accounting (`offline-operations-verification.json`) Optional fixed braking power receptivity bounds recovered and unaccepted regeneration energy. Scheduled receptivity supports multiple capacity windows within one braking event. Optional per-window energy fractions model piecewise constant braking power. Multiple timed braking events can share one receptivity capacity. Scheduled capacity changes split overlapping braking windows. Timetable CSV exports interval energy and input provenance. Coincident traction demand offsets braking power at one shared electrical point, with JSON and CSV energy accounting.",
      "release_evidence": [
        "offline-operations-verification.json",
        "rail-receptivity-verification.json",
        "rail-window-verification.json",
        "profiled-braking-verification.json",
        "rail-overlap-verification.json",
        "capacity-change-verification.json",
        "rail-timeline-csv-verification.json",
        "traction-offset-verification.json"
      ],
      "remaining_acceptance": "Validate a representative service timetable and moving-load substation network, including section topology, voltage limits, and measured regeneration receptivity.",
      "braking_benchmark": {
        "artifact": "ElectraGrid-rail-braking-evidence.zip",
        "sha256": "baaed615b70c0e3e7f12d58d16ed11eabab71868dc048993ffa27d24e4f32fea"
      }
    },
    {
      "workflow": "Utility-to-push-button model",
      "implementation": "AC-fed or prescribed-voltage trainer with loaded coil replay and CSV (`control-wiring-verification.json`)",
      "release_evidence": [
        "control-wiring-verification.json"
      ],
      "remaining_acceptance": "Verify physical device behavior and feedback of coil demand into the AC model."
    },
    {
      "workflow": "Optional single-line diagram",
      "implementation": "Optional grouped HTML, direct regeneration and linked drawing ZIP with model round-trip (`one-line-verification.json`)",
      "release_evidence": [
        "one-line-verification.json"
      ],
      "remaining_acceptance": "Verify equipment-specific symbols and physical print."
    },
    {
      "workflow": "Printable terminal-level drawings",
      "implementation": "Printable terminal HTML and trainer schematic (`schematic-verification.json`)",
      "release_evidence": [
        "schematic-verification.json",
        "ElectraGrid-pilot-drawing-evidence.json"
      ],
      "remaining_acceptance": "Verify symbols, sheet continuations, and physical print.",
      "shared_wire_replay": {
        "artifact": "ElectraGrid-shared-wire-replay.zip",
        "sha256": "5f46970b386b5cf21218300efffef85213f6fc2e0c14c36d5ad76320d8896fa3"
      },
      "pilot-review": {
        "artifact": "ElectraGrid-pilot-review-evidence.zip",
        "sha256": "2c2d67819a67c32585baf0e4a5827ad34ef1e1b7c1b4d53216966b5e9b075bc3"
      }
    },
    {
      "workflow": "Future NEC and NESC inspection workspace",
      "implementation": "Revisioned manual review records with evidence references (`inspection-verification.json`) Optional evidence file SHA-256 checks report matched, changed, missing, and unchecked files for manual review. Superseding inspection records cannot precede their prior record after timezone normalization. Active evidence summaries count file integrity statuses without changing manual review decisions.",
      "release_evidence": [
        "inspection-verification.json",
        "inspection-evidence-file-verification.json",
        "inspection-revision-time-verification.json"
      ],
      "remaining_acceptance": "Verify actual rule citations and edition-specific review with qualified specialists.",
      "portable_evidence_verification": {
        "artifact": "ElectraGrid-inspection-portable-evidence.zip",
        "release_sha256": "174a571143e5828317c1d8aee71b151fe09d8cd8e70cf74fe4b17868da548a5c"
      }
    }
  ],
  "standalone_evidence": {
    "ElectraGrid-protection-review-example.zip": {
      "recorded_release_sha256": "4c6f76443f18f58f61850406e346fd6e2f1c8e68d0e0faf2db9acc2ef095ba18",
      "same_as_current_release": false,
      "member_checksums_verified": 3
    },
    "ElectraGrid-native-wire-roundtrip.zip": {
      "recorded_release_sha256": "4c6f76443f18f58f61850406e346fd6e2f1c8e68d0e0faf2db9acc2ef095ba18",
      "same_as_current_release": false,
      "member_checksums_verified": 5
    },
    "ElectraGrid-loaded-control-examples.zip": {
      "recorded_release_sha256": "e695697b2e44d32bf0e2220549795b3bbe6c684a577233023f201518bb91a4e9",
      "same_as_current_release": false,
      "member_checksums_verified": 4
    }
  },
  "pilot_sha256": "312cd8bbf38c43af3ee4974d8cadf1a273cbea4a302633ae66f07491c4ea93f2",
  "acceptance_dependencies": {
    "Native CAD": "QElectroTech command-line native resave and QETZ label writeback verified on 69-wire and four-wire fixtures. AutoCAD Electrical terminal renumbering verified on individual fixtures. Broader native project workflows and drawing variations remain open.",
    "Commercial ETAP": "The staged IEEE 14-bus case matches the IEEE example installed with CNC40 ETAP 19.0.1.0 byte for byte. The companion TXT is also an input copy. Fresh import, settings reconciliation and exported solver results remain open.",
    "Engineering safety": "Obtain equipment and field data, independent grounding and incident-energy references, and engineering review for the intended site.",
    "Live integration": "Run an authorized live or staging historian/SCADA acceptance with real timestamp, quality, and point mappings."
  },
  "pilot_checks": {
    "native_wires": 69,
    "verified_artifact_count": 33,
    "print_pages": 5,
    "printed_wire_ids": 69
  },
  "release_guide": {
    "member": "README.md",
    "sha256": "b521ae05da10860c68959bd8ed5036ccd2264af398f80f13a6c40c48748c7141"
  }
}
