Sample data center restoration

A downstream feeder opens, then the upstream service opens before the feeder is restored. The load stays disconnected until a source path returns.

Simulated outage timeline
Elapsed timeLoads without service
0 minNone
15 minIT
22.5 minCooling, IT
30 minCooling, IT
37.5 minNone

165 kWh unserved energy · 500 kW peak disconnected load

Open project inputs and results

Download outage timeline CSV

Sample data center backup supply

The simulated transfer and return to utility left 125 kWh unserved across both interruptions.

With the backup source supplying the modeled load, the AC study calculated 0.527 MVA at the generator tie.

The studies use a synthetic network and prescribed switching times. Generator capability and transfer controls require separate verification.