Operations
Review simulated switching, historian replay, and restoration.
Sample data center restoration
A downstream feeder opens, then the upstream service opens before the feeder is restored. The load stays disconnected until a source path returns.
Simulated outage timeline
| Elapsed time | Loads without service |
| 0 min | None |
| 15 min | IT |
| 22.5 min | Cooling, IT |
| 30 min | Cooling, IT |
| 37.5 min | None |
165 kWh unserved energy ·
500 kW peak disconnected load
Open project inputs and results
Download outage timeline CSV
Sample data center backup supply
The simulated transfer and return to utility left 125 kWh unserved across both interruptions.
With the backup source supplying the modeled load, the AC study calculated 0.527 MVA at the generator tie.
The studies use a synthetic network and prescribed switching times. Generator capability and transfer controls require separate verification.