Engineers discussing a plot and electrical one-line diagram

Review offline study results and trace the fault-to-duty handoff.

Data center load flow and feeder outage

Open a synthetic model with utility supply, a switchboard, transformer, UPS/IT load, and cooling feeder.

Open the sample one-line · Download the ElectraNalis project · Open the study results · Run the example

Arc-flash incident-energy review

Technician reviewing an illustrative arc-flash warning on closed switchgear
Illustrative arc-flash label review

Download the combined protection project · Open the verified study reports · Review invalidation and replacement

Rerun fault, duty, and handoff

Place the project in the extracted ElectraNalis release folder and run:

python project.py iec-fault combined-protection-project.json
python project.py time-duty combined-protection-project.json
python project.py arc-handoff combined-protection-project.json --output handoff.json

This synthetic example includes an explicit IEC protection model alongside the panel and terminal wiring.

Use the trainer example to see the inputs and reports that support an incident-energy review.

  1. Open the IEC fault report and identify the fault location and bolted fault current.
  2. Review the time-based equipment duty and its clearing basis.
  3. Open the arc-flash handoff. Review the inputs and missing items, including enclosure, electrode configuration, working distance, and clearing-time basis.
  4. Use Audits & Approvals to record review notes under Fault reporting and arc-flash handoff.

The pilot produces a review handoff. A completed incident-energy calculation and engineering approval require additional evidence.

Run the equipment-duty and arc-flash review example